Tuesday, March 15, 2011

What's Going On... In Ebeye

here are some pictures of the work here in ebeye-


here is what the previous hall looked like.


you can see the tremendous amount of work that was involved with tearing down the previous hall and missionary home. the lower concrete pad is where the missionary home was. the concrete pad above it is the old kingdom hall floor.


once the old structures were demolished, we could begin working on the new kingdom hall. you can see in this picture that we had a lot of digging to do. what makes the job challenging is finding a place to put all the dirt. the worksite here in ebeye is pretty small and were putting a pretty big building in the space available.


after about a month of demolition and preparation, finally we put up the first of ten columns. these columns have over 30 vertical pieces of #8 steel and they are sitting on two giant 8x8 steel mats also with #8 steel bars .


here you can see how much work has been done in just the past month. last saturday we poured the base for our 4th and 5th column. do you see where the steel splays out from the columns on the picture to the right? that will be roof height of the kingdom hall. these columns have to go up one more floor because the new missionary home will be above the kingdom hall.

there is a lot of work ahead. everyone here is having a great time and we feel very privileged to be on an island with so many kind and generous people